STOP PRESS
The new Integra brochure is OUT NOW

Contact our sales team on 01964 626761 for a copy

Company Brochure
click here
to order a copy
Newsletter
click here
to download

Four Storey Modular Building, Canterbury College

Nov 2004
Four Storey Modular Building, Canterbury College

This four story modular building was another modular building project for Canterbury College, a key building to secure between £40-50million redevelopment. 

Why a modular building? 

This project had very tight time scales and was required before the 2004 college term started. The four story modular building needed to be situated on a steel podium which had to link in at all four floors of the modular building.

Modular building techniques were preferred over traditional methods due to the very tight timescales of this project and the high importance of delivering a modular building that was fit for purpose before the start of the new summer term.

Why Integra Buildings?

Integra Buildings had worked with Canterbury College the previous year delivering four portable and modular buildings within a very tight time frame once again. As each of these projects were delivered within specified timeframes and within the agreed budget Integra Buildings was the natural choice for this addition modular building.

Tel: 01964 626761 Fax: 01964 626762

email: sales@integrabuildings.co.uk

FMB MPBA Construction Line CHAS Daily Mail Ernst and Young IoD Link-Up
2008 Finalist
Entrepreneur
of the year
Finalist
Young Director
of the Year
2007 & 2008
Link-up ID
25134
achilles

Head Office

Integra House, Main Street, Burstwick, East Yorkshire HU12 9EA

© Integra Buildings Ltd

2007 All Rights Reserved